Transit EU
Award Transport (other)

8847 FourNorth Rail Line: Multi-Disciplinary Consultancy Services

Contracting authority: Iarnród Eireann-Irish Rail · Dublin · Ireland

Procedure
Contract award notice (CAN)
Contract value
€2.5M
Lots
1
Bids received
5
Service type
Transport (other)
Country
Ireland
Published
Feb 11, 2025

What does this mean?

What stage is this tender at?
Award: the contract has been awarded and is running.
What does “Contract award notice (CAN)” mean?
A contract award notice (CAN) reports the award or conclusion of a procedure.
Awarded to
Arup _4744

5 bids received.

Service

The Dublin to Belfast corridor is part of the North Sea – Mediterranean (NSMED) Core Network Corridor that provides a link to the border with Northern Ireland. The FourNorth Project will assess the existing capacity on the line between Connolly and Malahide, the required capacity in the years ahead and identify a preferred option to address the constraints between Connolly and Malahide, on the northern border of the Dublin metropolitan area. IÉ are seeking to engage an experienced multi-disciplinary Consultant to fully execute Phase 1 and 2 and partially deliver Phase 3 services (Preliminary Design incl. Preliminary Design Study and Preliminary Business Case) of IÉ’s Project Management Procedures, using latest applicable guidance.

Lots (1)

All lots with a service description from the notice.

  • 8847 FourNorth Rail Line: Multi-Disciplinary Consultancy Services
    Show service description

    The Dublin to Belfast corridor is part of the North Sea – Mediterranean (NSMED) Core Network Corridor that provides a link to the border with Northern Ireland. The FourNorth Project will assess the existing capacity on the line between Connolly and Malahide, the required capacity in the years ahead and identify a preferred option to address the constraints between Connolly and Malahide, on the northern border of the Dublin metropolitan area. IÉ are seeking to engage an experienced multi-disciplinary Consultant to fully execute Phase 1 and 2 and partially deliver Phase 3 services (Preliminary Design incl. Preliminary Design Study and Preliminary Business Case) of IÉ’s Project Management Procedures, using latest applicable guidance.

Public transport network in Dublin

Operators whose network runs through the tender's region — the real timetable context of this tender.

More tenders by Iarnród Eireann-Irish Rail

The tender history of this authority — prior information notices, calls and awards.

All 29 tenders by Iarnród Eireann-Irish Rail →

Official source: original notice ↗ · Data from official tender notices (TED, German national portal). No guarantee of completeness; the official notice is binding.