Transit EU
Award Transport (other)

Intermodal transport by rail of semi trailers between Aiton (FR) and Orbassano (IT)

Contracting authority: Ministère de la transition écologique et de la cohésion des territoires (MTECT) - France and Ministero delle infrastrutture e dei trasporti (MIT) - Italia · Savoie · France

Contract term
Jan 1, 2025 – Dec 31, 2027
Contract end
Dec 31, 2027 (~14 months left)
Procedure
Contract award notice (CAN)
Contract value
€42.0M
Lots
1
Service type
Transport (other)
Country
France
Published
Nov 29, 2024

What does this mean?

What stage is this tender at?
Award: the contract has been awarded and is running.
What does “Contract award notice (CAN)” mean?
A contract award notice (CAN) reports the award or conclusion of a procedure.
When does the contract expire?
According to the notice the contract ends on Dec 31, 2027 (~14 months left). After that the service is due to be tendered again.

Service

The service should provide for the intermodal transport by rail of semi trailers accompanied or not between the French railway station of Aiton (and vice versa) and the Italia railway station of Orbassano through the Frejus railway tunnel along a railway route of approximately 175 km.

Lots (1)

All lots with a service description from the notice.

  • Intermodal transport by rail of semi trailers between Aiton (FR) and Orbassano (IT) Jan 1, 2025 – Dec 31, 2027 €42.0M
    Show service description

    The expected maximum frequency of the service is 4 daily round trips between the Aiton and Orbassano stations, for 5 days per weeks, with 2 round trips on Saturdays, for a total amount of 50 weeks a year and a minimum theorical capacity of 22 units for a single route.

Public transport network in Savoie

Operators whose network runs through the tender's region — the real timetable context of this tender.

Official source: original notice ↗ · Data from official tender notices (TED, German national portal). No guarantee of completeness; the official notice is binding.