Transit EU

Edel Reisen

Operator
Timetable & stations of Edel Reisen →

Key figures

Vehicle-km / year (est.)
≈ 2.5M km
#1060 / 3,699 Top 29%
Vehicles (est.)
≈ 44
#878 / 3,699 Top 24%
Lines
16
#1231 / 3,699 Top 33%
Stops
372

Estimates from the network size and frequency published in GTFS, not reported by the company. Vehicles = peak of simultaneous trips (a lower bound, not the real fleet size); vehicle-km = scheduled service without empty runs, extrapolated from one representative week. Lines & stops are counted from the timetable. Timetables as of October 2026 · scheduled times, no real-time data · Methodology

1 tender with this operator →

Edel Reisen runs a public transport network with 16 lines and around 44 vehicles in service at the same time. With 2.5M km of scheduled service a year it ranks 1060 of 3,699 operators. Its network spans 5 regions.

Company facts

No company facts yet.

Company facts and group structure via Wikidata (CC0) where available.

Timetable of this operator

The stations Edel Reisen serves most often, with the next scheduled departures.

Departures/day: only the trips of Edel Reisen at the station, according to the timetable.

Modes & coverage

Bus 23
Service area
330 km²
Regions served
5
Trips / day
701

Modes by route records; service area from the grid cells the timetable serves.

Line list (16 lines)

Every line of the operator in the current timetable (line numbers as in its GTFS feed). Scheduled service, no real-time data. Underlined lines lead to the departures at the station they serve most often.

Line network

Loading the network of Edel Reisen …

Every route of the operator from the current timetable, drawn along the real alignments (GTFS shapes).

Tenders in the service area (12)

Prior information Freudenstadt Contract ends Apr 30, 2027 · in 6 mo
Busverkehr im Landkreis Freudenstadt: Regiobuslinie Freudenstadt - Ruhestein
Landkreis Freudenstadt
Prior information Freudenstadt Contract ends Apr 30, 2027 · in 6 mo
Busverkehr im Landkreis Freudenstadt: Regiobuslinie Baiersbronn - Ruhestein
Landkreis Freudenstadt
Prior information Freudenstadt Contract ends Apr 30, 2030 · in 4 yrs
Regiobusleistungen im Landkreis Freudenstadt
Landkreis Freudenstadt
Prior information Freudenstadt Contract ends Apr 30, 2030 · in 4 yrs
Regiobusleistungen im Landkreis Freudenstadt
Landkreis Freudenstadt
Prior information Calw Contract ends Jul 31, 2035 · in 9 yrs
Linien 670, 671, 672, 662, 880 und 668
Landkreis Calw
Prior information Reutlingen Contract ends Jul 31, 2036 · in 10 yrs
Linienbündel Bad Urach
Landkreis Reutlingen
Prior information Reutlingen Contract ends Jul 31, 2037 · in 11 yrs
Betrieb des Linienbündels Sonnenalb
Landkreis Reutlingen
Prior information Reutlingen Contract ends Jul 31, 2037 · in 11 yrs
Betrieb des Linienbündels Münsingen/St. Johann
Landkreis Reutlingen
Prior information Zollernalbkreis Contract ends Jun 30, 2038 · in 12 yrs
Stadtverkehr Hechingen
Stadt Hechingen
Prior information Tübingen, Landkreis
Personenverkehrsdienste im Linienbündel Ost
Landratsamt Tübingen
Prior information Tübingen, Landkreis
Personenverkehrsdienste im Linienbündel West 1, der Linie 115 und der Anrufverkehre im Verkehrsraum West
Landratsamt Tübingen
Prior information Zollernalbkreis
Personenbeförderungsleistungen im Linienverkehr mit Kraftomnibussen im Linienbündel „Burladingen“
Zollernalbkreis

Open prior information notices & calls for tenders in this operator's regions — an early indicator of upcoming re-tendering, not necessarily concerning this operator.

Regions served (5)

NUTS-3 regions the lines of this operator run through.

Operators in the same regions (20)

Key figures: the operator's public GTFS feed (sources & licences). Company data: Wikidata (CC0).