Transit EU

Public transport in Austria

Austria: 8 public transport operators, 122.9M km of scheduled service a year, 1,000 major stations and 287 tender notices — per region and operator.

Operators
8
Vehicle-km / year
≈ 122.9M km
Vehicles (peak)
≈ 1,393
Trips / week
279.9K
Stations*
1,000
Tender notices
287
Open procedures
174
Value (€)
€2.0B
Vehicle-km per inhabitant
–
Not ranked: partial timetables

Estimates from the scheduled timetables (one representative week per feed). *Stations with a page of their own. Methodology →

Austria over time

6 snapshots · Dec 2025 – Oct 2026

122.9M km ↓ −4% since Dec 2025
63.9M km127.7M kmDec 2025Oct 20262026

Vehicle-km over 12 months: −4% since Dec 2025. All countries →

The largest operators

Map →

By stage

287 Tender notices

By service type

  1. Scheduled public transport 210
  2. Other 35
  3. Taxi 14
  4. School transport 10
  5. Demand-responsive 10
  6. Rail 8

Most active contracting authorities

  1. 1 Verkehrsverbund Tirol GesmbH 53
  2. 2 Salzburger Verkehrsverbund GmbH 37
  3. 3 Niederösterreichische Verkehrsorganisationsges. m.b.H. (NÖVOG) 33
  4. 4 WIENER LINIEN GmbH & Co KG 24
  5. 5 Verkehrsverbund Steiermark GmbH 12
  6. 6 Verkehrsbetriebe Burgenland GmbH 11
  7. 7 Österreichische Postbus Aktiengesellschaft 11
  8. 8 Verkehrsbetriebe Burgenland GesmbH 7
  9. 9 Regionalentwicklung Oststeiermark GmbH 4
  10. 10 . 4
  11. 11 OÖ Verkehrsverbund-Organisations GmbH Nfg. & Co KG 4
  12. 12 Bundesministerium für Klimaschutz, Umwelt, Energie, Mobilität, Innovation und Technologie 4

How we calculate

Operators Unit: operators · counted
Transport companies as their timetable names them (GTFS agency). The same operator in several feeds is counted once; in Germany the company that actually runs each line. Source: published GTFS timetables, one representative week per feed
Vehicle-km / year Unit: km per year · estimate
For every trip: route length (along the published route shape; without one, the straight line between its stops × 1.25) × the days it runs in the representative week, × 365.25 / 7. Only scheduled service — no empty or depot runs, no demand-responsive services. Source: published GTFS timetables, one representative week per feed
Vehicles (peak) Unit: vehicles · estimate
The highest number of trips running at the same moment in the representative week — a lower bound: reserve and workshop vehicles are not included. Source: published GTFS timetables, one representative week per feed
Trips / week Unit: trips per week · counted
All scheduled trips in the representative week; trips given as a frequency (every 10 minutes) are expanded into single trips. Source: published GTFS timetables, one representative week per feed
Stations* Unit: stations · counted
Stations with a page of their own: at least 250 scheduled departures a day, or among a country's busiest 1,000 with at least 30. Capped per country, so not comparable between countries. Source: published GTFS timetables, one representative week per feed
Vehicle-km per inhabitant Unit: km per inhabitant and year · estimate
Vehicle-km per year of all operators in the country ÷ its population. Only countries whose timetables cover the whole country; the figure for all countries together is their vehicle-km ÷ their population. Source: published GTFS timetables, one representative week per feed; Eurostat, population on 1 January 2025
Tender notices Unit: notices · counted
Every published notice counts once: prior information, call for tenders or award notice. Source: TED (EU Official Journal) since 06/2024 and the German national portal
Open procedures Unit: notices · as published
Prior information notices and calls for tenders — notices that do not announce an award. Source: TED (EU Official Journal) since 06/2024 and the German national portal
Value (€) Unit: € · as published
Sum of the contract values stated in the notices, in euro only; other currencies are neither converted nor added. Many notices state no value, so the sum is a lower bound. Source: TED (EU Official Journal) since 06/2024 and the German national portal

Methodology & limits →