Transit EU

Public transport in Ireland

Ireland: 104 public transport operators, 279.3M km of scheduled service a year, 1,000 major stations and 275 tender notices — per region and operator.

Operators
104
Vehicle-km / year
≈ 279.3M km
Vehicles (peak)
≈ 2,371
Trips / week
161.9K
Stations*
1,000
Tender notices
275
Open procedures
144
Value (€)
€37.0B
Vehicle-km per inhabitant
≈ 51.3 km
Rank 12 of 25

Estimates from the scheduled timetables (one representative week per feed). *Stations with a page of their own. Methodology →

Ireland over time

15 snapshots · Mar 2025 – Oct 2026

279.3M km ↑ +7% since Mar 2025
139.7M km279.3M kmMar 2025Oct 20262026

Vehicle-km over 12 months: +8% since Oct 2025. All countries →

The largest operators

Map →

By stage

275 Tender notices

By service type

  1. Other 161
  2. Vehicle hire with driver 35
  3. Rail 26
  4. Taxi 26
  5. School transport 18
  6. Scheduled public transport 9

Most active contracting authorities

  1. 1 Donegal Education and Training Board_368 40
  2. 2 Health Service Executive (HSE) 36
  3. 3 Iarnród Eireann-Irish Rail 32
  4. 4 National Transport Authority_1149 30
  5. 5 Education Procurement Service (EPS) 24
  6. 6 KARE_473 7
  7. 7 Galway Roscommon Education and Training Board_92189 7
  8. 8 Transport Infrastructure Ireland (TII) 6
  9. 9 Ability West 6
  10. 10 The Office of Government Procurement 6
  11. 11 Department of Housing Local Government and Heritage 5
  12. 12 University College Dublin ( UCD ) 4

How we calculate

Operators Unit: operators · counted
Transport companies as their timetable names them (GTFS agency). The same operator in several feeds is counted once; in Germany the company that actually runs each line. Source: published GTFS timetables, one representative week per feed
Vehicle-km / year Unit: km per year · estimate
For every trip: route length (along the published route shape; without one, the straight line between its stops × 1.25) × the days it runs in the representative week, × 365.25 / 7. Only scheduled service — no empty or depot runs, no demand-responsive services. Source: published GTFS timetables, one representative week per feed
Vehicles (peak) Unit: vehicles · estimate
The highest number of trips running at the same moment in the representative week — a lower bound: reserve and workshop vehicles are not included. Source: published GTFS timetables, one representative week per feed
Trips / week Unit: trips per week · counted
All scheduled trips in the representative week; trips given as a frequency (every 10 minutes) are expanded into single trips. Source: published GTFS timetables, one representative week per feed
Stations* Unit: stations · counted
Stations with a page of their own: at least 250 scheduled departures a day, or among a country's busiest 1,000 with at least 30. Capped per country, so not comparable between countries. Source: published GTFS timetables, one representative week per feed
Vehicle-km per inhabitant Unit: km per inhabitant and year · estimate
Vehicle-km per year of all operators in the country ÷ its population. Only countries whose timetables cover the whole country; the figure for all countries together is their vehicle-km ÷ their population. Source: published GTFS timetables, one representative week per feed; Eurostat, population on 1 January 2025
Tender notices Unit: notices · counted
Every published notice counts once: prior information, call for tenders or award notice. Source: TED (EU Official Journal) since 06/2024 and the German national portal
Open procedures Unit: notices · as published
Prior information notices and calls for tenders — notices that do not announce an award. Source: TED (EU Official Journal) since 06/2024 and the German national portal
Value (€) Unit: € · as published
Sum of the contract values stated in the notices, in euro only; other currencies are neither converted nor added. Many notices state no value, so the sum is a lower bound. Source: TED (EU Official Journal) since 06/2024 and the German national portal

Methodology & limits →