Latvia: 27 public transport operators, 130.3M km of scheduled service a year, 1,000 major stations and 340 tender notices — per region and operator.

Operators
27
Vehicle-km / year
≈ 130.3M km
Vehicles (peak)
≈ 1,249
Trips / week
109.2K
Stations*
1,000
Tender notices
340
Open procedures
200
Value (€)
€422.5M
Vehicle-km per inhabitant
≈ 70 km
Rank 8 of 25

Estimates from the scheduled timetables (one representative week per feed). *Stations with a page of their own. Methodology →

Latvia over time

16 snapshots · Feb 2025 – Oct 2026

130.3M km ↑ +1% since Feb 2025
65.9M km131.8M kmFeb 2025Oct 20262026

Vehicle-km over 12 months: +4% since Oct 2025. All countries →

The largest operators

Map →

By stage

340 Tender notices

By service type

  1. Other 110
  2. Demand-responsive 73
  3. Vehicle hire with driver 72
  4. Scheduled public transport 44
  5. School transport 26
  6. Rail 15

Most active contracting authorities

  1. 1 Liepājas valstspilsētas pašvaldība 46
  2. 2 Ogres novada pašvaldība 21
  3. 3 Akciju sabiedrība "Pasažieru vilciens" 20
  4. 4 Jelgavas valstspilsētas pašvaldība 18
  5. 5 Gulbenes novada pašvaldība 17
  6. 6 Limbažu novada pašvaldība 16
  7. 7 Cēsu novada pašvaldība 15
  8. 8 Valmieras novada pašvaldība 14
  9. 9 SIA „Rīgas Austrumu klīniskā universitātes slimnīca” 11
  10. 10 Rēzeknes valstspilsētas pašvaldība 10
  11. 11 Ventspils valstspilsētas pašvaldība 10
  12. 12 Valsts SIA “Autotransporta direkcija” 9

How we calculate

Operators Unit: operators · counted
Transport companies as their timetable names them (GTFS agency). The same operator in several feeds is counted once; in Germany the company that actually runs each line. Source: published GTFS timetables, one representative week per feed
Vehicle-km / year Unit: km per year · estimate
For every trip: route length (along the published route shape; without one, the straight line between its stops × 1.25) × the days it runs in the representative week, × 365.25 / 7. Only scheduled service — no empty or depot runs, no demand-responsive services. Source: published GTFS timetables, one representative week per feed
Vehicles (peak) Unit: vehicles · estimate
The highest number of trips running at the same moment in the representative week — a lower bound: reserve and workshop vehicles are not included. Source: published GTFS timetables, one representative week per feed
Trips / week Unit: trips per week · counted
All scheduled trips in the representative week; trips given as a frequency (every 10 minutes) are expanded into single trips. Source: published GTFS timetables, one representative week per feed
Stations* Unit: stations · counted
Stations with a page of their own: at least 250 scheduled departures a day, or among a country's busiest 1,000 with at least 30. Capped per country, so not comparable between countries. Source: published GTFS timetables, one representative week per feed
Vehicle-km per inhabitant Unit: km per inhabitant and year · estimate
Vehicle-km per year of all operators in the country ÷ its population. Only countries whose timetables cover the whole country; the figure for all countries together is their vehicle-km ÷ their population. Source: published GTFS timetables, one representative week per feed; Eurostat, population on 1 January 2025
Tender notices Unit: notices · counted
Every published notice counts once: prior information, call for tenders or award notice. Source: TED (EU Official Journal) since 06/2024 and the German national portal
Open procedures Unit: notices · as published
Prior information notices and calls for tenders — notices that do not announce an award. Source: TED (EU Official Journal) since 06/2024 and the German national portal
Value (€) Unit: € · as published
Sum of the contract values stated in the notices, in euro only; other currencies are neither converted nor added. Many notices state no value, so the sum is a lower bound. Source: TED (EU Official Journal) since 06/2024 and the German national portal

Methodology & limits →